SGS completed approximately 25,000 square feet of overhead beam spall repairs. SGS formed overhead beams and pumped high strength grout as well as patched the overhead spalls with Sika VOH.
SGS partnered with Whiting-Tuner at Barry Farms Recreation Center to complete a variety of scope items, including installing new concrete, concrete repair, steel column base grouting, slab jacking, stormwater tank remediation, water filter installation, and concrete...
SGS placed 10,000 square feet of FRP to structurally support new loads at WRAIR Building 511. Additionally, SGS performed concrete beam enlargement around beams that FRP could not support the new required capacity.
SGS installed an elevator pit with underpinning, new slab on a metal deck, infilled stair pans, concrete pads for lockers, and infilled trenches for new plumbing.
SGS undertook the concrete, masonry, and waterproofing scopes for the full-scale restoration of the Annapolis Yacht Club. This included prepping and pouring footings, grade beams, slab on grade, columns, deck slabs, and an elevator pit. SGS also completed the full...